Saturday, October 24, 2009

Set, Measure, Place







Yup. That's the shower base. I tell you, this shower has required so much work and it's still not all in. I sure do hope it's worth it!

Here we have temporarily placed the base on the plywood base we installed (and in which we cut the hole).

Next we leveled the base. Once we felt we had it leveled we also needed to make sure the water would drain down the drain as it was supposed to. Hence, the picture of Dave dumping water in the base. NOTE: remember to either have someone hold a bucket below or make sure there is a bucket below to catch the water. Everything with our shower base seemed to be



set properly.

Then we had to remove it.

No comments:

Post a Comment