Yes!
We knocked out the temporary shower and I couldn't be happier. Do we have more work to do to repair the wall, the floor, etc? You bet. But we also now have a nice, new, workable bathroom. And, I can't tell you what a luxury it is to have a beautiful bathroom once again. It also opened up the front of the house to the back of the house. I'm a lucky girl. Here are some pics of us dismantling the shower. Exciting, eh?
Showing posts with label custom bath. Show all posts
Showing posts with label custom bath. Show all posts
Monday, November 26, 2012
Tuesday, September 4, 2012
Will the Bathrooms Ever Be Done? Yup!
We had planned to tile both bathrooms this last weekend but if you've been following along, you know nothing ever goes according to plan. However, that being said, we did get all the cement board up in both bathrooms so we CAN do the tiling - probably next weekend.
Downstairs Shower
Upstairs Shower
Earlier in the week we attempted to install the cement board on the angled ceiling in the upstairs bathroom. Even after cutting more and more off, it still didn't fit right, got jammed and we ended up damaging the drywall. It is actually worse than in the pictures. It will get replaced at some point but it's not a showstopper--thank goodness.
The following picture shows how we inserted a base on the floor of the shower so that if something fell on it it wouldn't damage the shower floor. We will keep it there through tiling. Another thing I want to communicate to you is that for the cement board in the downstairs bath, we did NOT countersink the screws. Because of that the screw heads are elevated so the tiles won't be flat. We need to go back and sink the screws. We made sure we did it upstairs. Now we just need to tape, etc. and we'll be ready for tile. I can't wait.
We had planned to tile both bathrooms this last weekend but if you've been following along, you know nothing ever goes according to plan. However, that being said, we did get all the cement board up in both bathrooms so we CAN do the tiling - probably next weekend.
Downstairs Shower
Upstairs Shower
Earlier in the week we attempted to install the cement board on the angled ceiling in the upstairs bathroom. Even after cutting more and more off, it still didn't fit right, got jammed and we ended up damaging the drywall. It is actually worse than in the pictures. It will get replaced at some point but it's not a showstopper--thank goodness.
The following picture shows how we inserted a base on the floor of the shower so that if something fell on it it wouldn't damage the shower floor. We will keep it there through tiling. Another thing I want to communicate to you is that for the cement board in the downstairs bath, we did NOT countersink the screws. Because of that the screw heads are elevated so the tiles won't be flat. We need to go back and sink the screws. We made sure we did it upstairs. Now we just need to tape, etc. and we'll be ready for tile. I can't wait.
Saturday, August 25, 2012
I cannot tell you how wonderful it is to have a working upstairs bathroom!
Well the shower still isn't working but that's okay for now. It's being worked on. Here are a few pictures of the upstairs bathroom. The sink and toilet are working. A mess still, yes, but I can work around it.
Dave insisted on the toilets that we installed - super water savers or something. I feel they were way overpriced and I don't particularly like the style for these baths but during a remodel you need to compromise so that's what we did.
The shower shows the plywood screwed up. That has since been overlayed with the Swanstone. We were petrified we might break it installing it but we didn't. It was a bear to install - very heavy.
This week we have been putting up cement board at the tops of the showers so that we can tile. We are planning the tiling for next weekend. Can't wait! Once the tiling is done we can get the plumber back to hook up the showers. What a grand day that will be!
Well the shower still isn't working but that's okay for now. It's being worked on. Here are a few pictures of the upstairs bathroom. The sink and toilet are working. A mess still, yes, but I can work around it.
Dave insisted on the toilets that we installed - super water savers or something. I feel they were way overpriced and I don't particularly like the style for these baths but during a remodel you need to compromise so that's what we did.
The shower shows the plywood screwed up. That has since been overlayed with the Swanstone. We were petrified we might break it installing it but we didn't. It was a bear to install - very heavy.
This week we have been putting up cement board at the tops of the showers so that we can tile. We are planning the tiling for next weekend. Can't wait! Once the tiling is done we can get the plumber back to hook up the showers. What a grand day that will be!