Why Can't It Just Work the First Time???
So here we go again...
I loved how the finish on the modified oak dresser looked after I put it on and how good it was going to look as our downstairs bath vanity. Not only that, I was thrilled that it was one more job that was getting completed.
Everything was going along according to plan but then...
Dave attempted to install the backsplash and when he removed some blue, low-stick masking tape from it, the entire finish came off!
Before I began the finish on the top of the vanity, we cleaned it well and believed there was NO wax on the surface. I guess we were wrong.
So, Dave sanded down the entire surface and now we have a clean top to work with - again.
Here's what it looks like now. We decided to get it installed and then I'll work on the finish again.
Sunday, June 3, 2012
Wednesday, May 16, 2012
Friday, May 11, 2012
What Dave's Up To
While I was priming the plywood walls, Dave was busy trying to get the toilet base fixed for the downstairs bathroom. The floor where the toilet goes rises 2.25 inches from the opposite end! Yup!
One picture shows Dave cutting some trim for the toilet base. Another picture shows the toilet base with a plastic wedge at the bottom. Dave cut the wedge from some vinyl trim stock that we had leftover from installing new windows in our garage at our last home.
I'm sure this will make more sense when it's been installed.
Isn't This Exciting?
Well kind of...
This is a cut piece of plywood (1 of 2) that I have primed (each side and edges) with one coat of primer. They are the end walls for the shower surround in the upstairs bath. Once these are up the surround can go up (I think) and then we also install backer board above for the tile work we plan on doing.
Monday, May 7, 2012
The Fun Part
We decided that the top of the dresser needed a little waterproofing so yesterday we went to Lowe's and purchased a brush and some polyurethane and it was my job to put a coat on. I put one coat on this morning and another one this evening after sanding very lightly with 220 grit sandpaper. I plan to add another coat tomorrow morning. Then we let it sit for 24 hours and voila! The top is done. I also added a coat to the backsplash and will also do another one tomorrow.
Pretty, eh? Love the grain.
Here's another picture, pre poly, that shows the grain.
Placement
We brought the dresser into the bathroom and placed it where it is to go. We also brought the toilet in to see how much room we had between drawers and the toilet. We did okay. Dave is going to modify the bottom two drawers around the plumbing so we don't loose the valuable storage space they offer.
I can't wait!
Subscribe to:
Posts (Atom)










